| A | 5-7-2026 | General Rewrite – Reordered sections Updated 1.1 – Quality System Requirements Added 1.5 – Control of Sub-tier suppliers Added 1.7 – Designated or Approved Sources Added 1.8 – Statistical Techniques and Product Acceptance Added 1.14 – Shelf Life and Age Control Added 1.23 – Export Control and Trade Compliance |
Table of Contents
By accepting this PO, the supplier agrees to all terms and conditions listed here. Foundry/Casting Supplier requirements are in addition to the General Requirements.
Supplier to acknowledge purchase order for confirmation.
Supplier to ship specified quantity requested on purchase order. Any over or under shipments must be approved by Uni-Tek prior to shipment. Extra product may be returned at supplier expense.
1.0 – General Requirements:
Order of Precedence
In case of a conflict, the following order applies:
- Applicable law and government regulations
- Purchase Order, PO Codes, PO Notes
- Drawings, Specifications, Parts Lists, MOTs
- Customer/Design Authority Requirements
- This Document
In case of conflict between the PO requirements or this document and any relevant customer Supplier Quality Manual (Honeywell SPOC, Curtiss-Wright QP 06000, Shimadzu SPR-001, etc) the customer document takes precedence. Please direct any questions or concerns regarding applicability to the appropriate buyer.
Supplier QMS & Performance Evaluation
1.1 – Quality System Requirements
Supplier is required to implement and maintain a quality management system (QMS) appropriate to the products and services provided to Uni-Tek.
Suppliers are expected to comply with one or more of the following standards, as applicable to their scope of work, or with an equivalent quality system: AS9100, AS9120, ISO/IEC 17025.
All suppliers and sub-tier suppliers performing special processes shall maintain NADCAP certification for that process, unless the products supplied are Commercial Off-The Shelf (COTS) items, the supplier holds design authority for the supplied items, or as otherwise approved in writing by Uni-Tek.
Supplier required to ensure that employees are qualified and capable of fulfilling all requirements for the product, process, or service performed under this purchase order.
1.2 – Supplier Performance
Uni-Tek’s goal is that all suppliers meet all quality requirements for the product or service provided to fulfill this purchase order. Uni-Tek measures suppliers’ quality performance and may take action when suppliers don’t meet minimum quality objectives. Actions taken may include corrective action requests, suspension from Uni-Tek’s approved vendors list, or other actions intended to drive increased quality performance.
Supplier is expected to meet minimum performance objectives:
- Quality – 97% or higher quality rating (average)
- Delivery – 95% or higher on-time delivery
1.3 – On-Time Delivery
Supplier is required to meet on-time delivery of products and service as defined on the purchase order. If there is a discrepancy with PO date Uni-Tek must be notified immediately. Supplier on-time delivery performance is measured and Uni-Tek may take action when supplier fails to meet minimum on-time delivery performance objectives.
1.4 – Right of Access
Supplier acknowledges Uni-Tek’s, its customer, and regulatory authorities’ right of access to all facilities involved in the manufacture or processing of the order and to all applicable manufacturing/quality records at any level of the supply chain.
Supply Chain and Purchasing Controls
1.5 – Control of Sub-tier Suppliers
The supplier, as the recipient of the purchase order or contract, is responsible for meeting all requirements, including work performed by the Supplier’s sub-tier suppliers.
1.6 – Flow-down Requirements
Supplier shall include (flow-down) on purchase orders and contracts all applicable requirements, including quality system requirements, regulatory requirements, right of access, the use of Uni-Tek or Uni-Tek’s customer designated or approved sources (when applicable), the requirement to document and control ‘key characteristics’, and to furnish certifications and test reports as required.
1.7 – Designated or Approved Sources
When specified by the Purchase Order, drawing, part standard, technical specification, or customer flow-down provisions the Supplier shall use appropriate Uni-Tek or end-customer-approved external providers, including special process sources.
The Supplier shall use the specifically designated source, when provided, or a source selected from the applicable customer-approved supplier list. Prior to subcontracting any work, the Supplier shall verify that the selected source holds current approval for the specific process being performed.
Product Integrity, Handling, & Execution
1.8 – Statistical Techniques and Product Acceptance
When the Supplier utilizes sampling for product inspection and acceptance, the sampling plan must be justified on the basis of recognized statistical principles and appropriate for the criticality of the product. Unless otherwise authorized by Uni-Tek in writing, the Supplier must use a c=0 (accept on zero) sampling plan. The Supplier must maintain documented information of the statistical techniques used, and Uni-Tek reserves the right to review and approve any sampling plans prior to use.
1.9 – Uni-Tek/Customer Property
Uni-Tek or Customer-owned property includes
(1) materials, tooling, or equipment supplied by Uni-Tek, and
(2) tooling or equipment fabricated by the Supplier but paid for by Uni-Tek.
The Supplier is fully responsible for this property while it is in their possession and must identify, verify, protect, and safeguard it to ensure its continued suitability for use. Any loss, damage, or unsuitability for use must be immediately reported to Uni-Tek and documented by the Supplier.
Suppliers who retain Uni-Tek or its customers’ property are required to have a system, including written procedures, for management of such property.
1.10 – Test Specimens
When test specimens of raw material are requested, they must be supplied from the same material or heat lot as the material supplied to satisfy the requirements of this purchase order. Special process test specimens must meet the requirements for test specimens outlined in the process specification.
1.11 – Counterfeit Material
Supplier is required to prevent the use of counterfeit materiel and parts and to ensure traceability of parts and components to their original or authorized manufacturers.
1.12 – FOD Prevention
Supplier is required to have a FOD (foreign object damage) prevention program in accordance with AS9146, NAS412, Honeywell SPOC 418, Boeing D6-85622, or similar. Supplier shall ensure that all foreign objects and any subsequent foreign object damage is eliminated from all parts prior to shipment.
1.13 – Preservation of Product
Supplier is required to properly handle, package, and preserve product such that contamination, corrosion, and physical damage is prevented.
1.14 – Shelf Life and Age Control
For all shelf life-limited materials (e.g., adhesives, sealants, paints, elastomers), the Supplier must provide the date of manufacture, the date of expiration, and the lot/batch number on the product packaging and the accompanying Certificate of Conformance. Unless otherwise specified on the Purchase Order, all shelf life-limited materials must have a minimum of 50% of their total shelf life remaining upon receipt at Uni-Tek.
Nonconformance & Change Management
1.15 – Nonconforming Product
Nonconforming product must be identified and controlled to prevent unauthorized use or delivery. Supplier must notify Uni-Tek of any nonconforming products, processes, or services. Uni-Tek must provide a disposition for all nonconforming product before supplier can proceed with PO processing/manufacture or shipment. Supplier may be required to complete a corrective action request. Supplier shall provide prompt written notification if nonconforming product or process escapes are identified after shipment to Uni-Tek.
1.16 – Corrective Action
Suppliers are responsible for timely responses to corrective action requests. Suppliers are expected to complete containment within three (3) manufacturing days, if required, and thirty (30) days to complete and return the corrective action request with objective evidence. Extensions may be granted where appropriate. Failure to reply or consistent late replies may result in suspension from Uni-Tek’s approved vendors list.
1.17 – Notification of Changes
Supplier to notify Uni-Tek of any changes in product, processes, or services, including changes to sub-tier/external suppliers; Uni-Tek must provide documented approval before proceeding with purchase order. Supplier to notify Uni-Tek of management, ownership, designated representative changes, temporary or permanent facility changes affecting the current location, and company name changes. Changes to status in controlled process certification status or quality management system accreditation must also be reported to Uni-Tek.
Documentation & Records
1.18 – Certification of Compliance Requirements
Supplier shall provide a certification (C of C) with each shipment that all parts or processes conform to the purchase order requirements, including any applicable customer or specification requirements. Supplier to identify revision level of all specifications, drawings, process requirements, and other relevant technical data on certs and C of C’s. Supplier shall perform inspection, as necessary, to determine the acceptability of all product or processes included in the purchase order. All product delivered to Uni-Tek under this purchase order is subject to final inspection at Uni-Tek.
Supplier must meet all requirements for test, inspection, or verification of product or processes supplied under this purchase order, including any customer or specification requirements.
1.19 – Material and Process Certifications
When required, Supplier shall provide complete documentation demonstrating conformity to all applicable requirements specified on the drawing, specification, and any product standards flowed down through the PO. As applicable, the Supplier shall provide
- Raw Material certifications
- Chemical and physical test results
- Heat/Lot identification and traceability (to original source)
- Applicable material specification and revision level
- Special Process Certifications
- The specific process performed
- Applicable process specification and revision level
- Class, grade, type, method, or condition, as required by the specification
- Inspection Report
- Actual Range of inspection results for the relevant production lot
- Production Lot / Serial Numbers
- Lot Qty
- Sampling Plan and Inspection Frequency
Full certification package must only be provided once per lot, provided any future shipments of the same lot include a reference on the C of C to the production lot and shipment where full certification package was provided.
1.20 – Retention Requirements
Supplier shall maintain objective evidence of inspections, tests, results, and dispositions for nonconforming product. Such records shall be identified to provide traceability to process or production lots. Records shall be available upon request and must be maintained for a period not less than eleven (11) years, unless otherwise specified. Records for traceability (lot or serial number) items and critical items must be kept indefinitely and shall not be destroyed without Uni-Tek or customer’s written approval. Record retention requirements for distributor standard off the shelf product shall be seven (7) years.
Regulatory & Corporate Responsibility
1.21 – Awareness
Supplier must ensure that their employees are aware of their contribution to the product or service conformity, their contribution to personal and product safety, and the importance of ethical behavior.
1.22 – Code of Ethics
Supplier is required to have a written code of business ethics and to promote compliance with its code of business ethics within the company.
1.23 – Export Control and Trade Compliance
Supplier agrees to comply with all applicable U.S. export control laws and regulations, including but not limited to the International Traffic in Arms Regulations (ITAR) and the Export Administration Regulations (EAR). The Supplier acknowledges that Uni-Tek furnished data, hardware, or technology may be subject to export controls (including EAR99 and 900-series classifications). The Supplier shall not transfer, disclose, or export any controlled item, technical data, or service to a Foreign Person (as defined by U.S. law), either within the U.S. or abroad, without obtaining the necessary export licenses or authorizations. The Supplier is responsible for flowing down these export compliance requirements to all sub-tier suppliers.
1.24 – ITAR/DFARS Requirements
If this purchase order specifies a 600 series ECCN (e.g., 9A619.x), a USML code, or states “ITAR APPLIES”, or similar then the requirements in DFARS 252.204-7012 and DFARS 252.204-7020 apply. Supplier is required to have performed at least a basic self-assessment of their covered contractor information system in accordance with NIST SP 800-171 and reported or submitted their score to the Supplier Performance Risk System (SPRS).
2.0 – Foundries / Casting Suppliers:
2.1 – Order Acknowledgement
Foundries must acknowledge receipt and acceptance of purchase order within seven (7) days of purchase order placement. Purchase order confirmations acknowledge agreed upon/contracted price. Invoices will be paid at purchase order or contract price, unless otherwise approved, in writing, by Uni-Tek.
2.2 – Configuration
Make complete per specified customer MOT and purchase order provisions. Product must comply to all end customer requirements and specifications, unless previously approved, in writing, by Uni-Tek. Ensure any applicable specification revisions are correct and current. Any new specification changes must be implemented within sixty (60) days of specification revision date. All applicable certs, detailed inspection plans (DIP’s), and certificate of conformance (C of C’s) must be sent with each shipment.
2.3 – FAIR
Foundries must comply with end customer first article inspection report (FAIR) requirements: A new FAIR is required for revision changes, tool rework, updates, frequency requirements, or two (2) year lapse out of production. Foundries are responsible for providing frequency to Uni-Tek with each shipment (number of pieces produced since date of last full FAIR). A new FAIR must be provided with certification packet, if required.
2.4 – Communication
Foundries to furnish status reports to Uni-Tek as requested. No early receipt of castings will be accepted more than five (5) manufacturing days prior to Uni-Tek request date, unless approved by Uni-Tek. Net payment terms will be based on this policy.